While reviewing the manufacturing cost, I noticed an additional Labor Expense of ₹3,000 that wasn’t included in the BOM. Where should I record this?

While reviewing the manufacturing cost, I noticed an additional Labor Expense of ₹3,000 that wasn’t included in the BOM. Where should I record this?

Since it wasn’t part of the BOM, can we still add it to the manufacturing record separately?

Yes :+1: You can record this using the Add Expense option inside the Manufacturing module.

Steps:

  1. Open the specific Manufacturing Order/Record.

  2. Click on Add Expense.

  3. Enter the details:

    • Category: Labor

    • Amount: ₹3,000

  4. Save the entry.

This will ensure the additional labor cost is included in the total manufacturing cost without modifying the original BOM.

Perfect :+1: That way the total production cost stays accurate.