While reviewing the manufacturing cost, I noticed an additional Labor Expense of ₹3,000 that wasn’t included in the BOM. Where should I record this?
Since it wasn’t part of the BOM, can we still add it to the manufacturing record separately?
Yes
You can record this using the Add Expense option inside the Manufacturing module.
Steps:
-
Open the specific Manufacturing Order/Record.
-
Click on Add Expense.
-
Enter the details:
-
Category: Labor
-
Amount: ₹3,000
-
-
Save the entry.
This will ensure the additional labor cost is included in the total manufacturing cost without modifying the original BOM.
Perfect
That way the total production cost stays accurate.